{"id":7982,"date":"2014-08-08T20:40:57","date_gmt":"2014-08-08T20:40:57","guid":{"rendered":"http:\/\/library.missouri.edu\/newsnotes\/?p=7982"},"modified":"2014-08-08T20:40:57","modified_gmt":"2014-08-08T20:40:57","slug":"4th-floor-renovation-update","status":"publish","type":"post","link":"https:\/\/library.missouri.edu\/newsnotes\/2014\/08\/08\/4th-floor-renovation-update\/","title":{"rendered":"4th Floor Renovation Update"},"content":{"rendered":"<p>\n\t<a href=\"http:\/\/library.missouri.edu\/newsnotes\/wp-content\/uploads\/sites\/25\/2014\/08\/Renovation.jpg\"><img loading=\"lazy\" decoding=\"async\" alt=\"Renovation\" class=\"alignnone size-full wp-image-7983\" height=\"442\" src=\"http:\/\/library.missouri.edu\/newsnotes\/wp-content\/uploads\/sites\/25\/2014\/08\/Renovation.jpg\" width=\"590\" \/><\/a>\n<\/p>\n<p>\n\tThe 4<sup>th<\/sup> floor Ellis student study space expansion is well under way.&nbsp; Rooms 4C12 and 4B11 have been removed and the space is being painted this week and the week of August 11. A study bar will soon be installed along the north wall and run between the 3 window wells.&nbsp; Bar stools have been purchased and comfortable chairs will be moved into the area from other parts of Ellis.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 4th floor Ellis student study space expansion is well under way.&nbsp; Rooms 4C12 and 4B11 have been removed and the space is being painted this week and the week of August 11. A study bar will soon be installed<span class=\"ellipsis\">&hellip;<\/span><\/p>\n<div class=\"read-more\"><a href=\"https:\/\/library.missouri.edu\/newsnotes\/2014\/08\/08\/4th-floor-renovation-update\/\">Read more <span class=\"screen-reader-text\">4th Floor Renovation Update<\/span><span class=\"meta-nav\"> &#8250;<\/span><\/a><\/div>\n<p><!-- end of .read-more --><\/p>\n","protected":false},"author":32,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"categories":[8,1],"tags":[],"class_list":["post-7982","post","type-post","status-publish","format-standard","hentry","category-building-and-space-issues","category-uncategorized"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-13 22:00:18","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/posts\/7982","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/users\/32"}],"replies":[{"embeddable":true,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/comments?post=7982"}],"version-history":[{"count":1,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/posts\/7982\/revisions"}],"predecessor-version":[{"id":7984,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/posts\/7982\/revisions\/7984"}],"wp:attachment":[{"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/media?parent=7982"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/categories?post=7982"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/library.missouri.edu\/newsnotes\/wp-json\/wp\/v2\/tags?post=7982"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}